Project

Supply and installation of equipment necessary to supply power to the ram in a tank control box.

Missions

  • Site surveys and studies
  • Automation Studies, drafting of functional analysis, programming
  • Electrical distribution studies
  • Supply, installation and connection to the lighting of the pit and the workshop
  • Supply, installation and connection of electrical equipment including a power cabinet, desk
  • Testing and commissioning of electrical equipment
  • Automatic lighting management of the pit and the hall
  • The automatic control of the opening / closing of the “opening of the hall”